by wpadmin | Apr 21, 2014
The work includes replacement of HVAC equipment, ductwork, associated controls and incidental related work.
by wpadmin | Mar 21, 2014
Install lateral lines from the main vacuum and air lines running above the first floor finished ceilings to an area beneath room. Install hot and cold water lines and drain to accommodate new sink. Lines and drain to be of size equal to those for sinks in adjacent...
by wpadmin | May 14, 2013
The work includes installation of interior fence barriers, relocation of furniture and equipment, wall construction, minor HVAC and electrical work and incidental related work.