by wpadmin | Apr 21, 2014
The work includes replacement of HVAC equipment, ductwork, associated controls and incidental related work.
by wpadmin | Apr 17, 2014
This project will replace the #3 feedwater steam turbine and #3 feed water pump. The project includes the replacement of gate and check valves in both the feedwater piping and steam piping for the #3 pump and turbine system.
by wpadmin | Mar 28, 2014
The responsibility of the contractor is to perform the repairs listed in the detailed requirements and specifications on building RR110. RR110 is a 572 square foot storage building located off Rifle Range rd at Stone Bay.
by wpadmin | Mar 21, 2014
Install lateral lines from the main vacuum and air lines running above the first floor finished ceilings to an area beneath room. Install hot and cold water lines and drain to accommodate new sink. Lines and drain to be of size equal to those for sinks in adjacent...
by wpadmin | Feb 27, 2014
The work includes demolishing the existing interior partition walls separating room 108A from room 108 in Building 3898 and removing existing double door from room 108A to the corridor, filling in the door opening. Install new full height interior modular wall...