Add AC to Comm Room Bldg AS222

Remove spot cooler from Comm Room 8, patch wall penetrations. Install 2 ductless mini-split air conditioning systems. Install a hard-wired thermostat with each system. Provide an equipment pad suitable for the selected unit weight. Install 2 dedicated single phase, 30...

Replace #3 Feedwater Pump B-152

This project will replace the #3 feedwater steam turbine and #3 feed water pump. The project includes the replacement of gate and check valves in both the feedwater piping and steam piping for the #3 pump and turbine system.

Building Repairs RR110, Stone Bay/Rifle Range

The responsibility of the contractor is to perform the repairs listed in the detailed requirements and specifications on building RR110. RR110 is a 572 square foot storage building located off Rifle Range rd at Stone Bay.

Dental Room Modifications, Building 15

Install lateral lines from the main vacuum and air lines running above the first floor finished ceilings to an area beneath room. Install hot and cold water lines and drain to accommodate new sink. Lines and drain to be of size equal to those for sinks in adjacent...