The work includes the construction parade deck reviewing stand and
incidental related work.
The work includes construction and installation of a pre-engineered sentry
booth with masonry veneer, UL level 3 bullet resistant glazing, standing
seam metal roof, and HVAC. Also included is a single sided marquee with a
LED screen, masonry cabinet, and electrical supply for the marquee at the
main entrance to the complex. Project includes underground utilities, site
excvation, and flat concrete work.