Steel Access Platforms-Buildings 131, 250, & 152

The work included construction of a steel-framed platform with a metal bar grating walking surface to an existing mechanical unit in Hanger 131; construction of a steel ladder for access to an existing steel framed platform in Hanger 250; & demolition of an...

Replace GRIT System WWTP, B4376

The work included modifying existing headworks, demolishing the two existing Pista Grit 270s, grit washer, communitor, associated piping, asphalt, force mains, scum holding tank, scum pump station and other miscellaneous items. New work included two new Pista Grit...

ARRA, P-1357, Child Development Center

The work included new construction of a child development center with the necessary utility infrastructure and incidental related work, including playground equipment.