by wpadmin | Mar 21, 2014
Install lateral lines from the main vacuum and air lines running above the first floor finished ceilings to an area beneath room. Install hot and cold water lines and drain to accommodate new sink. Lines and drain to be of size equal to those for sinks in adjacent...
by wpadmin | Feb 27, 2014
The work includes demolishing the existing interior partition walls separating room 108A from room 108 in Building 3898 and removing existing double door from room 108A to the corridor, filling in the door opening. Install new full height interior modular wall...
by wpadmin | Feb 25, 2014
The work includes a new pre-engineered metal building with lighting, heat, ventilation, site work, and incidental related work.
by wpadmin | Aug 22, 2013
Clean, inspect, and replace four (4) damaged ceramic insulators, three (3) are located on precipitator #1. One is located on the east and west inlet side and one on the east outlet side of #1 precipitator. One (1) insulator on the west outlet upper side of...