Dental Room Modifications, Building 15

Install lateral lines from the main vacuum and air lines running above the first floor finished ceilings to an area beneath room. Install hot and cold water lines and drain to accommodate new sink. Lines and drain to be of size equal to those for sinks in adjacent...

Upgrades to Building 3898

The work includes demolishing the existing interior partition walls separating room 108A from room 108 in Building 3898 and removing existing double door from room 108A to the corridor, filling in the door opening. Install new full height interior modular wall...

Make Various Repairs and Paint, Buildings 4210 (APOE EMBARK)

Replace the rooftop package HVAC with and updated energy efficient system. Replace exterior doors. Replace windows with metal white metal white double sash, explosion proof windows. Replace sub panels with new Square-D panels. Replace all plumbing fixtures throughout...