by wpadmin | Dec 20, 2013
The work includes the demolition of various equipment, installation of an electric fire pump controller, 480V panelboard, step down transformer, 208Y/120V panelboard and incidental related work.
by wpadmin | May 14, 2013
The work includes installation of interior fence barriers, relocation of furniture and equipment, wall construction, minor HVAC and electrical work and incidental related work.
by wpadmin | Aug 10, 2012
Repaired existing shower, added a shower install HVAC and exhaust systems, toilets, urinals reinstall partitions, replaced fixtures install floor tile in the bathrooms and replaced the tile floors in the break rooms.