B-3499 Fire Booster Pump Control

The general intent of this project is to modify the existing electric fire pump control for the 300 HP electrically driven fire pump in Building 3499 by demolishing the existing 1200A, 480V Motor Control Center (MCC) and installing new electrical service equipment and...

Repair Bathrooms Building 93

Repaired existing shower, added a shower install HVAC and exhaust systems, toilets, urinals reinstall partitions, replaced fixtures install floor tile in the bathrooms and replaced the tile floors in the break rooms.