Install lateral lines from the main vacuum and air lines running above the first floor finished ceilings to an area beneath room. Install hot and cold water lines and drain to accommodate new sink. Lines and drain to be of size equal to those for sinks in adjacent...
by wpadmin | Aug 23, 2012
Lanham Field is a new 1444 square foot masonry building with a metal roof. The building will be a concrete slab with an exterior of ground face CMU block wainscot and brick veneer. The interior will be ground face block walls, terrazzo floors with mechanical and...
by wpadmin | Jan 30, 2012
We are currently participating in the General Construction Multiple Award Construction Contract (MACC) program for Camp Lejeune and Cherry Point. Before downloading any of these projects to bid, PLEASE READ the general specifications for these programs. All projects...