The work includes demolishing the existing interior partition walls separating room 108A from room 108 in Building 3898 and removing existing double door from room 108A to the corridor, filling in the door opening.
Install new full height interior modular wall partitions in rooms 101 and 105 including electrical and lighting modifications to accommodate the new partitions. Install a new conduit and roof penetration from room 110.