Construct Golf Cart Storage Building

THE CONTRACTOR SHALL PROVIDE AND INSTALL A 6,250SF PRE-ENGINEERED METAL BUILDING 50’0”X125’0”X10’0” EAVE PER THE DRAWINGS/PLAN IN ATTACHMENT J. JOB SHALL INCLUDE BUT NOT LIMITED TO SITE PREP, FOUNDATION, ELECTRICAL AND MECHANICAL,...

Base Pass Requirements

The MCB Camp Lejeune and MCAS Cherry Point are now issuing DBIDs Badges for Base Pass. They will no longer accept RapidGate after December 31, 2018. You must contact Ellen Hartness at Blue Rock Structures, Inc. for letter and forms (the letter is only good for 30...