by wpadmin | Jun 18, 2014
The work includes renovating the existing Building PT5. Work to include minor site excavation and new planting. Interior demolition includes concrete slab, door frames and doors, interior wall partitions, electrical panels, wiring, and lighting, plumbing fixtures and...
by wpadmin | Jun 12, 2014
The contract provides improvements and repairs to existing BEQ at MCAS, Cherry Point, N.C. The work includes but is not limited to replacing windows, doors, exterior concrete balconies, exterior guardrails, and providing new interior finishes; minor structural...
by wpadmin | Mar 28, 2014
The responsibility of the contractor is to perform the repairs listed in the detailed requirements and specifications on building RR110. RR110 is a 572 square foot storage building located off Rifle Range rd at Stone Bay.
by wpadmin | Feb 25, 2014
The work includes a new pre-engineered metal building with lighting, heat, ventilation, site work, and incidental related work.
by wpadmin | Aug 23, 2013
The work includes pavement demolition, site grading, earthwork and minor storm drainage work, sedimentation and erosion control, construction of a new paved parking lot, turf establishment and incidental related work.