by wpadmin | Aug 18, 2017
The work includes repairs and upgrades to the existing headworks facility at the existing Wastewater Treatment Plant and incidental related work.
by wpadmin | Feb 19, 2015
The work includes replacing electrical panels and subpanels, replacing the fire alarm system, installing a fire suppression sprinkler system, replacing split system heat pumps, repainting interior doors and frames, painting exterior steel surfaces, replacing floor...
by wpadmin | Jun 26, 2012
The purpose of this project is to provide reclaimed (non-potable) water, supplied by final effluent pumps at the wastewater treatment plant, to supply water for the wastewater treatment plant headworks in an effort to reduce the usage of potable water. The following...