by wpadmin | Jan 12, 2012
The work included interior and exterior repairs to masonry walls, paint all interior and exterior surfaces, install gutters, repair pool and pool deck, new HVAC system, new electrical, and add an accessible family changing room.
by wpadmin | Jan 12, 2012
The work included repairing balcony slabs for thirteen Enlisted Barracks. Repairs consisted of repairing concrete spalling at the face, drip edges and underside of each slab; repairing cracked patches; repairing transverse rebar showing through the underside of...
by wpadmin | Jan 12, 2012
The work included demolition of interior finishes, plumbing, mechanical and electrical systems. New interior layout and finishes, new plumbing, mechanical, electrical systems, new sprinkler system and new fire alarm system and incidental related work.
by wpadmin | Jan 12, 2012
The work included construction of a steel-framed platform with a metal bar grating walking surface to an existing mechanical unit in Hanger 131; construction of a steel ladder for access to an existing steel framed platform in Hanger 250; & demolition of an...
by wpadmin | Jan 12, 2012
The work includes the cleaning and grubbing of approximately 5 acres of dense woods to create a 3 firing lane addition to the Relocated Skeet Range. This work is intended to expand the Skeet Range on the east side of the range, provide a permanent office/retail...